Frank B. Koller

Memorial Library

Photos from our carpeting project



 Audio books moving into their temp. home in the semi

 Shelves being moved to one side of the library for the first side of carpeting to go down

 Most of our library materials were stored in these trailers

 Carts waiting to be loaded

 Old carpet being removed



Upcoming Events